FJGP4D feature : Production Line Balance Study

Production Line Balance Study / Mixed Flow Production

It is possible to simulate mixed flow production where multiple products are produced on the same production line.Based on the work procedure for each product and each worker, it is possible to automatically set the start timing for each work cycle and verify the total work time including waiting time.

  • Schedule mixed flow production to simulate production of products with different cycle times.
  • It is possible to check interference of walking path, work delay and waiting condition between workers.
  • The results of mixed flow production simulation can be displayed as Gantt chart or CSV output.
Mixed Flow production simulation, Gantt chart

Production Line Balance Study / Man-Machine interface

It is possible to examine the efficient work procedure of man and machine in the automation facility.
By dragging and dropping the process balance table so that the worker does not have to wait for the machine to complete the work, it can immediately be checked the change of the work procedure, the walking path, and the effort in 3D.

  • Cycle time verification is possible considering the timing of synchronization between workers and equipment and waiting time.
  • In the process balance table, it is possible to change the work procedure by simply dragging and dropping another work between waiting times.
  • You can intuitively edit the synchronization timing between workers and equipment, and the cycle time changes accordingly.
Man-Machine interface (waiting)→Edit Process balance chart (Befor Drug and drop) After (Reflect to simulation)